You are here: Home » News

News

  • FRP Pole Top Box for Split Energy Meter includes two parts: single-phase Pole Top Box for Split Energy Meter and three-phase Pole Top Box for Split Energy Meter. It is suitable for the measurement, control and management of single-phase electric energy and power energy in the power supply system wit
  • 1) Regularly check the use of the Ready Board, check whether the heat dissipation of the Ready Board is good, and do not put the combustibles too close to the heat source.In particular, check whether the Ready Board is overloaded, and try to avoid using multiple high-power Ready Boards at the same t
  • All boxes of the Ready Board manufacturer shall be welded with the main grounding terminal on the box structure. The main grounding terminal shall match the larger grounding conductor in the grounding box, and the grounding terminal mark required by the specification shall be made at the grounding t
  • Many maintenance personnel do not pay attention to the maintenance of the Ready Board, so it greatly reduces the service life of the Ready Board. In order to better prolong the service life, here is how to do a good job in the maintenance of the Ready Board.1. The Ready Board shall be regularly dedu
Add : Baitawang Industrial Zone, Beibaixiang Town, Yueqing City, 325603, China
Phone : +86-18767732171
E-mail :  INFO@RAIXIN.COM

RUIXIN ELECTROMECHANICAL CO., LTD.

     Add : Baitawang Industrial Zone, Beibaixiang Town, Yueqing City, 325603, China
     Phone : +86-18767732171
     E-mail :  INFO@RAIXIN.COM

Product Inquire

Copyright   2021 Zhejiang Ruixin Mechanical & Electrical Co., Ltd