Split Meter Ready Board use details

Views: 3     Author: Site Editor     Publish Time: 2023-02-12      Origin: Site

The following are some details of the use of Split Meter Ready Boards:

Make sure that the total power of all equipment does not exceed the rated power of the Split Meter Ready Board.

The Split Meter Ready Board must be installed in a dry, ventilated, easy-to-operate and maintain location.

Keep the area around the Split Meter Ready Board clean from debris and dust accumulation to ensure it works properly.

Regularly inspect and maintain the Split Meter Ready Board to ensure that all wires and connections are secure and not loose or damaged.

Make sure the fuses or circuit breakers in the Split Meter Ready Board match the ampere rating of the required circuit to avoid overload and fire risk.

Do not replace or move the parts of the Split Meter Ready Board at will, and must be repaired and replaced by a professional electrician.

There should be sufficient space around the Split Meter Ready Board for emergency shutoff in the event of an emergency.

Do not leave the Split Meter Ready Board in a humid environment to avoid the risk of electric shock.

The above are only some common details, and the specific usage precautions need to be understood and operated in detail according to the actual situation and relevant laws and regulations. When using the Split Meter Ready Board, be sure to pay attention to safety to avoid accidents.

MSK

RUIXIN ELECTROMECHANICAL CO., LTD.

    Add : Baitawang Industrial Zone, Beibaixiang Town, Yueqing City, 325603, China
    Phone : +86-18767732171
    E-mail : INFO@RAIXIN.COM
Leave a Message
Product Inquire
Copyright  2021 Zhejiang Ruixin Mechanical & Electrical Co., Ltd