You are here: Home » News » Do you really know how to use the FRP meter box?

Do you really know how to use the FRP meter box?

Views: 13     Author: Site Editor     Publish Time: 2022-12-04      Origin: Site

We all know that the meter box is very useful, but it is not easy to say "can use". Today we will talk about the use of the glass meter box in the meter box, but we do not advocate you to do it yourself! Because safety is the most important thing!


FRP meter box includes single-phase meter box and three-phase meter box, which are suitable for metering and control management of single-phase electric energy and power electric energy in the power supply system with AC 50HZ or 60HZ, rated working voltage of 200V, 380V, 690V, and rated working current of 10A~225A.


Method/step of glass fiber reinforced plastic meter box:


1. The first thing to pay attention to when using the FRP meter box is to pay attention to the use conditions, because the meter box has high requirements for temperature. A Ambient temperature: - 40 °~+80 ° C, and the average temperature shall not exceed+35 °. B The air shall be clean, and the relative humidity shall not exceed 80% at 40 ° C. Higher relative temperature is allowed at lower temperature.


2. The cover of the multi air energy high protection FRP meter box is made of imported weather resistant polycarbonate (PC), and the bottom of the box is made of flame retardant ABS and PC/ABS alloy engineering plastics. It has high insulation performance, high transparency, UV resistance, aging resistance, acid rain resistance, high temperature resistance, low temperature resistance, high impact strength, and good rain proof, dust proof, ventilation, heat dissipation and other functions, with a normal service life of more than 20 years.


3. The glass fiber reinforced plastic meter box adopts the integrated design concept, which is composed of meter position boxes I, II, IV, VI, VIII, X, XII, XIV and XVI and the main control box. It can be installed and used in a single box, or it can be assembled and used by the incoming line of the main control box. The main switch controls the installation of multiple boxes, and the entire metering circuit is assembled in an integrated closed box. Users can separate and control, which is easy to install and manage, and can prevent electricity thieves from touching the metering volume, thus preventing electricity theft.


4. The FRP meter box has beautiful design, smooth lines, transparent and clear cover, and reasonable layout of the meter position and electrical components in the box. It can be discussed to install various types of electrical components, centralized reading collector, etc. A three-way hook is used to push the box cover to connect the box. A special lead sealing screw device is set in the lower middle of the electricity meter position of the box cover. The lower part of the box cover is fixed and interlocked with the box with a lead sealing screw and padlock. Only the electricity management personnel can open the box with a special lead sealing screw wrench and key. The full transparency of the box cover is convenient for the electricity management personnel to read and copy clearly and observe all kinds of abnormal phenomena in the box directly in time. In order to eliminate the hidden danger of using electric clocks in advance, and achieve the management goal of "safe use of electricity, prevention first".

Meter boxType F Ready Boardpole top box


RUIXIN ELECTROMECHANICAL CO., LTD.

    Add : Baitawang Industrial Zone, Beibaixiang Town, Yueqing City, 325603, China
    Phone : +86-18767732171
    E-mail : INFO@RAIXIN.COM
Leave a Message
Product Inquire
Copyright  2021 Zhejiang Ruixin Mechanical & Electrical Co., Ltd